TESTING OF AUSTRALIAN IRON ORES IN A HYDROGEN DIRECT FLASH SMELTING PROCESS

 

Join our webinar on HILT CRC Project RP1.009 Testing of Australian iron ores in a hydrogen direct flash smelting process.

This project leverages the significant iron ore processing expertise and industry network brought together by HILT CRC to accelerate the development of Calix’s ZESTY technology to deliver a low-carbon, cost-competitive and scalable technology for iron ore processing.

The key objectives are to identify the most prospective Australian iron ores for ZESTY processing and provide important process and product data to inform and de-risk the design of the ZESTY demonstration plant.

The goal of this project is to evaluate the potential of Calix’s ZESTY technology for processing a range of Australian iron ores to a low-carbon DRI product using their pilot facility in Bacchus Marsh to establish critical parameters, such as: (i) degree of metallisation; (ii) throughput and productivity; (iii) energy consumption; and (iv) yield.

The presentation will include results from pilot plant studies at Calix’s facility, laboratory test results and kinetic modelling of the process.

SPEAKERS

Stay up to date

Subscribe to our newsletter for the latest HILT CRC updates